SCCL JMET Result 2015 | Download Expected Cut off list

By | May 18, 2015

SCCL JMET Result 2015 | Download SCCL JMET Expected Cut off list | Score Card | SCCL JMET Merit List : SCCL JMET- The Junior Mining Engineer Trainee Exam was conducted on 10th May 2015. For that the result as well cut off list has been released. The students who appeared in the exam are early waiting for the both of the things on an extent level. As per the students demand the answer key is the main source to check out and measure your performance. It gives students the satisfaction on a level. The answer key and the cut off list will be uploaded on the official website very soon. The website has been given below:

SCCL JMET Result 2015

  1. the result of SCCL JMET Exam is available on
  2. the cut off list for different categories will be available on the same site very soon.
  3. The cutoff list is generated depending upon different categories and it doesn’t carry much difference. The student is measured on the basis of his /her performance in the exam.
SCCL JMET Result 2015

SCCL JMET Result 2015

The Performance list of the Written Exam conducted on 10th May will shown as follows:

  • Visit
  • Go to career options
  • Click upon View Results
  • Click upon written test Performance list of Junior Mining Trainee Exam
  • The performance list will be opened

There you can check the performance wise students appearance list

About the Company: The Company’s accredited function is to explore and exploit the coal deposits in the Godavari valley coalfield, now this is only repository of coal in all over the region of South India. Mining workin SCCL are presently spread over four districts of Telangana mainly in following..

  • Adilabad
  • Karimnagar
  • Khammam

The studies of Geological Survey of India attribute as much as 22207 million tones of coal reserves in the Godavari valley coalfield.

SCCL JMET Result 2015

This is mainly deep like 1200 meters in the downward direction and it includes reserves proved, indicated as well as inferred. the main coal witch is extracted by the SCCL in the Godavari valley coalfield up to the year 2013-14 was about 1135 approx million tones.

Share on FacebookShare on Google+Tweet about this on Twitter

Leave a Reply

Your email address will not be published. Required fields are marked *